Selected bus: -- | Selected branch: --
Buses
0 saved
Branches
0 saved
Loads
0 saved
No system loaded
○ Not solved
Live results
Healthy — V 0.95–1.05 pu · line <60%
Marginal — V outside band · line 60–90%
Heavy — line 90–100%
Violation — V <0.90/>1.10 · overload
SlackPVPQ (bus ring)
Double-click a line: outage / restore. Without a mouse: pick the branch in the editor's Branches list and toggle In service.

The single line diagram is a picture of the Power System. Every element it draws is also listed in the editor panel, where a bus, branch, generator or load can be reached and changed with the keyboard. To take a line out of service without a mouse, select it in the Branches list and toggle the In service checkbox.

Editor ready | data saves locally